I am embarking on a process to get them to change their standard but I was wondering what you experts thought while I am doing this (in case they refuse). I have submitted a sample of a drawing we completed with an isometric view of this piping as a full view (iso view created by IV) but they are requesting something simpler like they are used to (one-line iso pipe spool-type thing with symbols instead of modeled valves, etc.). We have already provided models, review drawings, design drawings, and fabrication drawings for this product but what they are looking for is a simple isometric pipe diagram where they can hand write their weld test data and put the material data sheet number references. I have been asked by one of my clients to provide an isometric piping diagram for a product that we have modeled/developed for them.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |